INCH DUO Operation and charging procedure

 

Table of Contents

3. Operation and charging procedure

INCH DUO charging station can be controlled locally or remotely, through web interface, or through charging station management system. Configuration and usage of the charging station’s web interface is described in the next chapter.

First Power up

Before starting the station, it is absolutely necessary to read this manual and the technical specification of the device.

Connect charging station to the power supply in the electrical cabinet. Installation feeder should be turned on.

Charging station has overcurrent and RCD protection installed, check whether the protection elements are in ON position.

Charging station is powered up automatically when it is connected to the electricity.

When the charging station is power up for the first time it can take several minutes for station to get ready to start using it to charge EV.

Status of LED

LED colour

State

LED action

Sub-state

Green

 

  • Booting

  • OK

  • Available

Steady green

Booting

Steady green

Connector available

Blink green slow

Preparing for charging

Blink green fast

Waiting for vehicle

Blue

 

  • Charging

Blink blue

Charging

Steady blue

Charging ended

Steady blue

Charging paused (by EV or by EVSE)

Red

 

  • Fault

  • Unavailable

Blink red

Fault

Steady red

Connector unavailable

Setting of Maximal Charging Current

Max power is set by the installer based on the grid capabilities where charging station is installed. If there is need to change it, please set the current limitation in the charging station’s web interface before starting the first charging session.

First Charging Session

When the charging station is ready to be used, follow the procedures described on the LCD screen. Two charging modes can be selected:

Fast charging (default)

Interactive charging

Charging modes are chosen during the charging session.

During the fast-charging EV will be charged with the max available charging power as fast as possible. Max power is set by the installer based on the grid capabilities where charging station is installed.

When Interactive charging is chosen the charging schedule will be modified based on the inserted departure time. If it is not inserted, it will be based on the default value. Historic data are recorded from the first charging session onward and can only be used after the first charging session is finished.

More charging session means more accurate session prognosis and schedules. Charging schedule will be created based on electricity prices, other loads, and PV production to make sure EV is charged in appropriate time while taking in consideration other constraints.

Charging Procedure

Step 1: WAKE

In normal conditions, the charging station’s LCD screen will likely be in the screen saver mode. Charging station can be woken up by simply tapping the screen.

Screen saver mode can be chosen in the charging station’s web interface. Three options of display setting exist: turned on all the time, blinking or turned off until touched.

 

 

Figure 10: Screen saver

Step 2: AUTHORISATION

Depending on the charging station authentication mode chosen different screens will be shown that will need different actions from user to continue with the charging session. What authorization is allowed can be setup in the charging station’s web interface Configuration menu.

Plug and charge mode

In the plug and charge mode message is shown to insert the cable and start the charging session.

Needed authentication

If authentication is needed, select the type of authentication that will be used to authorize and continue with the charging session.

 

Figure 11: Choose authorisation method, first screen

 

Figure 12: Choose authorisation method, second screen

Insert PIN code

 

Figure 13: Insert PIN code

Use mobile app to authenticate

 

Figure 14: Insert charging station's EVSE code

Either type the code of the station to the mobile app or scan QR code with mobile.

 

Swipe RFID card

By simply swiping the RFID card below the LCD touch screen where the RFID module is installed, the authorization on the charging station is made and the charging session can begin.

 

 

Figure 15: Swipe RFID card

Step 3: CONNECTING THE CABLE

After the successful authorization, the screen with the description to connect the cable is shown.

 

Figure 16: Connect the cable to charging station

If the cable is connected before the authorization this screen will be left out and after the authorization next screen “Waiting for vehicle to respond” will be shown. When the cable is connected charging station will start charging as soon as EV responds.

 

Figure 17: Charging station is waiting for EV to responds and starts charging

 

Figure 18: Notification of charging start

 

Figure 19: Display of information during charging

Step 4: DEPARTURE TIME INPUT

As soon as the charging session begins, the screen to input departure time is shown. Presented departure time is the one calculated by the charging station based on previous charging habits. The presented departure time can be changed to make sure that the EV is charged.

When the departure time is set, or default setting is let through charging data will be shown.

What charging information is shown depends on the settings of Web interface.

Check Status of the Charging Station

In the web interface the information of the current session can be seen. The departure time can be changed using web interface by pressing the »Interactive mode« button.

Information is also presented on the LCD display of the charging station.

Figure 20: Examples of shown status on the LCD screen

 

Figure 21: Example of shown consumed energy on the LCD screen

 

Figure 22: Example of shown consumed energy on the LCD screen

Stop the Charging Session

Charging station can be stopped locally or remotely.

Locally

The charging session can be ended by using the same authorization method as for starting the session (using an RFID card, mobile application, PIN code) and removing the plug from the charging socket or, in the case of a station configuration without authorization, by simply removing the plug from the charging socket.

Remotely

Stop of charging session can be done remotely with the use of Web interface.

Paying Procedure in Case of Cluster of Charging Stations

It is possible to implement several INCH DUO charging stations into the same cluster and having the paying terminal installed only on one of them. In this case, the LCD display will lead the customer, on which charging station it is possible to pay for the charging.

Figure 23: Paying procedure in case of clusters, notification at charging station where charging was made

 

Figure 24: Paying procedure in case of clusters, input of designation of charging station where charging was performed at another charging station with paying terminal

 

Warning! Before installing, wiring, handling or accessing the charging station in any way, make sure to read, understand and follow the Safety Guidelines.
Any graphic material provided in this documentation library is subject to variation and may not reflect the most recent updates or changes due to ongoing development and the implementation of new features.
Owing to periodic improvements of our products, the supplied products can differ in some details from the information stated in this documentation library. The information is subject to alteration without notice.
The English version of this documentation is the official and authoritative source of information. We make every effort to ensure that translations are accurate and clear; however, we do not accept responsibility for any errors, omissions, or misinterpretations in translated versions. In case of discrepancies, the English version will take precedence.


Landis+Gyr | Privacy Policy | Disclaimer