Teltonika router + switch installation guide
This document is an installation guide for router and switch upgrade on INCH DUO EV charging stations.
You will need a standard small-head flat screwdriver and zip tie cutter.
1. Package partsÂ
Â
The package contains:Â
LTE Router TELTONIKA RUT240 (PEM-0723)Â
Router holder clamp (PME-0745)Â
Power supply (PPS-1157)Â
Switch (PEM-1059)Â
Wiring for router (PCG-1151)Â
Wiring for switch (PCG-1153)Â
Wiring for power supply (PCG-1334)Â
UTP cable 0.5 (PCE-1156)Â
UTP cable 0.25 (PCE-1118)Â
Adapter SMA plug to UMRF jack (PEX-1645)Â
Two zip ties (PMF-1032)Â